[Es2] new project scope (long) -need feedback
Jimmy Pribble
Jimmy at texasbankers.com
Fri Mar 12 11:50:55 EST 2004
> Can you snap some pics of the 3b fuel rail?
In the meantime, this photo should be good enough to see most everything you
might need to see (fuel in/out locations, fuel line locations).
http://www.urs4.com/logbook/RS2CQ/registry/TV/DSCN0439.JPG
This weekend I will post a photo of the AAN and ADU fuel rails. The three
are all different. Even though ADU is similar to 3B in design (external
hard line) and layout, the fuel line does not go over the intake manifold,
but rather under it at the back. It could be for no other reason than to
preserve the "Powered by Porsche" badge engineering.
For the archives: I used the RS2 fuel rail and fuel lines. We were able to
bend the CQ hard lines enough to get it to work. The RS2 fuel lines were
particularly expensive, so finding 3B parts might be a more cost-efficient
way to go. YMMV.
Jimmy
More information about the Es2
mailing list