The best I found was about 1400 landing on us shores, went a little more with Intended Acceleration, cuz he had the only one available now. All folks I checked were in the 6-8week lead times, a long time to wait for that much power. Should have mine installed by FEB 5, will update the results. Scott PDQSHIP@AOL.COM 87 5ktqRS2-2B