[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: 90 Stress bar install



On Fri, 2 Jul 1999, Len Ferrara wrote:

>     Basically the EC article (August 92) explains haow to install a
> Neuspeed bar using something called a "Nutsert". A Nutsert is a threaded
> insert that is compression installed in the strut tower. Only 1 hole
> need be drilled  in the top sheet metal.(double wall tower). No welding
> and the anchor is now flush to the sheet metal. Very clean installation.

Hmmm... does this have the same rigidity as the conventional "drill
through both walls" method?

Mark

                               With searching comes loss
                               and the presence of absence:
                               "My Novel" not found.
                               -- Howard Korder