The UK quattro Network
1980/1 Model Years - notes to Wiring Diagram 1
- The main diagram does not identify the pin assignments for the rpm sender (G28) and timing position sender (G4).  These are 3-2-1 in both cases, left to right.  The diagram also suggests that the shield connection - the leftmost in each case - is connected to the sender.  This is not the case - pin 3 should be open-circuit to both pins 1 and 2.
- The main diagram shows F25 in track 47 as "normally open".  This is incorrect - it is "normally closed" and opened at full throttle to de-energise N54, the full load enrichment solenoid.
Kerbside Motors Home Page and Contact Information
Contact Phil Payne by email or use mobile/SMS 07833 654800