The UK quattro Network
ur-quattro 20V - Engine Removal and Refitting
When refitting the engine the following points should be observed in the reverse order of removal:
- Check that the sleeves for aligning the engine are gearbox are present
- Self-locking nuts must always be renewed
- Check that the clutch plates are centred
- All gaskets and seals must be renewed
- Clean the gearbox drive splines and apply a thin coating of G 000 001
- Ensure the coolant manifold bracket is not trapped between engine and gearbox
- The new O-ring for the right-angled coolant pipe on the engine block must be inserted in the hole, not pulled over the end of the pipe.
- The loom for the multifunction switch, thermoswitch and oil pressure sender must be laid forwards under the ignition leads, between the heater valve and the AKF-valve, under the distributor and between the crankcase ventilation hose and coolant manifold.
Continued on next page
Kerbside Motors Home Page and Contact Information