[Author Prev][Author Next][Thread Prev][Thread Next][Author Index][Thread Index]

Re: bomb recharge procedure???



>Anyway, when folks talk of the bomb being at 2000 psi I guess that means
>its _initial_ pressure; and that new bombs are shipped dry (empty of
>hydraulic fluid) at first? If so, the "membrane" needs to be pretty rigid
>to be able to retain that initial nitrogen charge against merely
>atmospheric pressure (?). I hadn't thought about that before this thread.
the "membrane" needs to be flexible enough to stretch to the opposite
wall until a sufficient quantity of incompressible fluid (hopefully
pentosin) is pumped into the empty side of the chamber...

frank

to: IN:pjrose@servtech.com
cc: IN:quattro@coimbra.ans.net